§
02 — Arbeit
/ Case study
Lindenau Station
Wayfinding for a rebuilt railway station
Client
Lindenau Transport Authority
Place
Leipzig
Year
2025
Services
Signage system, platform graphics, timetables
Duration
18 months

Fig. 01 — Cover
2025
§
01
Zusammenfassung
Summary
levels
signs
ornaments
§
02
Geschichte
The story
The brief
The rebuilt station opened with confusing signs and a queue at the information desk. The authority asked for a full replacement in eighteen months, without closing a platform.
The rules
One typeface, two sizes, four arrow angles. Platform numbers are set very large and are the only element that ever repeats on a wall. Fraktur appears once, on the historic hall plaque.
The result
Desk enquiries fell by 46 percent in the first quarter. Every sign is drawn from the same master grid.


People ask staff less. That is the whole review.
Frank Holler, Project lead
§
03
Weitere Arbeiten
More work
&
Something like this?
Send a short brief. We reply within two working days.


